No. | Equipment | Name | Max. workpiece dimension(L*W*H) | Max. workpiece weight | Qty. |
---|---|---|---|---|---|
1 | Large parts painting line | 12000mm*7000mm*5000mm | 50T | 1 | |
Built in strict accordance with ISO 12944-2 C5 corrosion level, while referring to the surface coating standard of offshore wind turbines of Siemens , Vestas, Shanghai Electric, Envision and other well-known companies. Process:Washing——abrasive blasting——zinc spraying——primer——intermediate coat——topcoating——inspection,repair and maintain Temperature and humidity also the blasting chamber cleanliness were controlled during process; ; good ventilation system; thorough process document ,operating standards, a variety of related inspection means to achieve timely and effective verification; to ensure that the coating products to meet corrosion requirements under the work environment of offshore wind turbines. |